grúa pórtico encontró reparación anormal y ruido oportuna

09-04-2020

The gantry crane wire rope should be smooth and smooth once every two weeks, and should be dusty before lubrication. As usual, if any joints of the wire rope are found, if more than 6 cracks are found, they should be immediately discarded and d.

(Daily pre-shift inspection) When the wheel wear exceeds 15% of the original thickness or there is cracking, it should be d.

There should be no shortage of oil in the accelerator, it should be exchanged regularly, and if abnormalities and noise are found, they should be repaired in time.

Check the brakes of the lifting organization every time before use, and check the brakes of the operating organization every day before use.

El vice-avanzado adopta polipasto eléctrico. Debido a la operación incorrecta, hace que partes para aflojar, la fatiga del metal y otras razones. Se hace especial hincapié en las inspecciones semanales y un registro cuidadoso.

grúa pórtico

Obtenga el último precio? Le responderemos lo antes posible (dentro de las 12 horas)